PoWerHiveMind

Replay · AC power flow · N-1

Watch an agent plan the wires for two data centers

A fresh Claude agent with PoWerHiveMind gets a design brief and a case. The case is built on a public synthetic 2,000-bus Texas grid. Two new 1,000 MW data-center loads sit in it, not connected to anything. The agent has to connect both in full AC power flow and pass N-1.

Pick a prompt to replay that run. Every line below is condensed from the agent's own messages, with the real run clock. This page does not run PowerWorld.

Speed run clock 00:00

Planning stages

    Pick a prompt to start the run.
    Latest price stated–
      • new 230 kV circuit
      • new 500 kV circuit
      • right-of-way, not used
      • existing grid
      • load served
      • load not connected
      • problem found (red ring or red line)
      You → Claude + HiveMind
      Choose Prompt A or Prompt B above.

      What the agent is doing

      1. The agent's steps appear here as the run plays.

      The result card appears when the run ends.