Replay · AC power flow · N-1
Watch an agent plan the wires for two data centers
A fresh Claude agent with PoWerHiveMind gets a design brief and a case. The case is built on a public synthetic 2,000-bus Texas grid. Two new 1,000 MW data-center loads sit in it, not connected to anything. The agent has to connect both in full AC power flow and pass N-1.
Pick a prompt to replay that run. Every line below is condensed from the agent's own messages, with the real run clock. This page does not run PowerWorld.
Speed
run clock 00:00
Planning stages
- new 230 kV circuit
- new 500 kV circuit
- right-of-way, not used
- existing grid
- load served
- load not connected
- problem found (red ring or red line)
You → Claude + HiveMind
Choose Prompt A or Prompt B above.
What the agent is doing
- The agent's steps appear here as the run plays.
The result card appears when the run ends.