FAKE DEMOsynthetic grid · invented numbers · single-outage (N-1) study

Design Compare · bus 6015 (+300 MW load)

A new 300 MW / 60 Mvar data center lands at bus 6015. Your fix is one new 345 kV line. The network visualizer measured it and sketched three challengers. Pick a card; the map shows what that option does to the grid.

Demo

Options

345 kV 138 kV ≤69 kV your new line agent's addition not measured yet uprated overload low voltage generator line out

Where each wins

    No winner declared. Your call.

    Every bus number, rating and result on this page is invented for the demo. No real utility, place or case.